Pre-installation inspection functions: bus alignment, glue flow integrity, bus spacing, and rubber road integrity; automatic identification and alarm for defective products.
Post-installation inspection functions: bus inspection, glue line inspection, junction box inspection; automatic identification and alarm for defective products.
Uses unordered J-boxes for input, applicable to different specifications of J-boxes, facilitating J-box switching operations.
Equipped with J-box out-of-stock alarm function and J-box position deviation alarm function.
AC380V, Three-Phase Five-Wire, 50Hz
0.6-0.8MPa, ≥200L/min
Bypass Mode
>1 hour
<10 minutes
99.5%
14 seconds
Length (1630-2650mm) x Width (950-1450mm)
Three-Hole J-box